Capital Expansion

For the 2016.2017 season, Whistler Blackcomb plans to invest approximately $8.0 million to upgrade and expand the Garibaldi Lift Company restaurant, the ski and snowboard learning terrain and infrastructure on Whistler Mountain, summer hiking trails, and the Roundhouse Lodge restaurant on Whistler Mountain, including constructing a new glacier-view sightseeing deck.

Rendezvous lodge & christine’s on blackcomb

During the summer of 2015, in preparation for the winter 2015.2016 season, Whistler Blackcomb did a massive overhaul of the Rendezvous Lodge and Christine’s on Blackcomb Mountain. The building has a brand new look with increased seating capacity and more intuitive flow to complement the locally and ethically sourced menu options in both the food court and Christine’s.

CABINS ON THE WHISTLER VILLAGE GONDOLA

For the 2014.2015 season, Whistler Blackcomb invested $6 million to replace the existing Whistler Village Gondola cabins which have been transporting guests up the mountain since 1988. The new “Diamond” level cabins were selected to dramatically improve the experience for skiers, snowboarders, and sightseers with all eight passengers able to sit comfortably on bench seating. The new configuration improved capacity for the Whistler Village Gondola by approximately 12 per cent through greater loading efficiency.

RFID TECHNOLOGY ON WHISTLER AND BLACKCOMB MOUNTAINS

Whistler Blackcomb invested an additional $5.9 million during the 2014.2015 season in information technology initiatives, including a radio-frequency identification (“RFID”) system with lift access control gates added to most mountain lifts. The benefits of the RFID technology include reduced wait times at Whistler Blackcomb’s main access points and the minimization of unpaid lift access. RFID has also allowed for the implementation of WB+, an online social interactive platform for guests. For more information about WB+, please visit https://www.whistlerblackcomb.com/purchase/tickets-and-passes/wb-plus.

Crystal Zone on Blackcomb Mountain

Blackcomb Mountain was updated with a new high-speed quad chairlift in the Crystal Zone, previously accessed by a fixed-grip triple chair in the 2013.2014 season.

The new chairlift also received an alignment change. The bottom terminal of the old Crystal Chair sat at 1,450m but the bottom terminal of the new lift was moved 158m lower to 1,292m. The top terminal of the new chairlift in the Crystal Zone remained in the same location, next to the Crystal Hut at 1,827m.

Lift Specs:

  New Lift Existing Lift
Capacity 2,400 skiers per hour 1,520 skiers per hour
Length 1,708m / 5,604ft 370m / 1,214ft
Vertical Rise 535m / 1,755ft 377m / 1,236ft

Harmony Zone on Whistler Mountain

Whistler Mountain's Harmony high-speed quad chairlift was replaced with a new Doppelmayr high-speed, detachable, six-pack chairlift capable of transporting six people on each chair in the 2013.2014 season. The Harmony Chair alignment did not change.

Lift Specs:

  New Lift Existing Lift
Capacity 3,600 skiers per hour 2,400 skiers per hour
Length 1,729m / 5,672ft 1,729m / 5,672ft
Vertical Rise 525m / 1,722ft 525m / 1,722ft